Biological Resource Studies

Featured Projects . . .
Dumbarton Transit Oriented Development FMC Parcel C
HELIX prepared an IS/MND addressing construction of a mixed-use development on 17.4 acres as part of the Dumbarton Transportation Oriented
Read more.
Angels Camp Sewer Line Collection System
HELIX is currently preparing a CEQA Initial Study/Mitigated Negative Declaration (IS/MND) and a Mitigation Monitoring and Reporting Program (MMRP) for
Read more.
City of San Diego Brush Management Plan
The City of San Diego Open Space Division, under three awarded FEMA grants, carried out a brush management plan to
Read more.
Rancho Guejito Witch Fire Biological Damage Assessment
HELIX Environmental Planning (HELIX) conducted studies to assess effects of the Witch Fire on the 21,000-acre Rancho Guejito property located
Read more.
El Dorado County Cooperative Wildland Fire Prevention Strategy
HELIX Environmental Planning (HELIX) is providing environmental services for a fuel break project in El Dorado County involving cooperative efforts
Read more.
California High Speed Rail
HELIX Environmental Planning has prepared desktop environmental constraint analyses for segments of 16 potential high speed rail alignment corridors extending between
Read more.
Caltrans District 11 On-Call Environmental Services
HELIX was awarded a three-year multi-disciplinary contract with Caltrans District 11 to provide environmental, biological, and cultural resources services, with
Read more.
Qualcomm Stadium Wetland Mitigation
HELIX is leading a 57-acre habitat restoration project within the San Diego River channel, between I-15 and I-805, south of
Read more.
City of San Diego Bicycle Master Plan Update PEIR
HELIX Environmental Planning prepared a Programmatic Environmental Impact Report (PEIR) for an update to the City of San Diego’s existing
Read more.
Torrey Pines City Park General Development Plan
HELIX prepared a Biological Technical Report (BTR), Air Quality and Greenhouse Gas (GHG) Technical Report, and draft Initial Study/Mitigated Negative
Read more.
Palmdale Regional Groundwater Recharge & Recovery
HELIX Environmental Planning prepared an Environmental Impact Report (EIR) and conducted associated technical studies (including biological resources, acoustics, and air quality/greenhouse
Read more.
Carlsbad Oaks North
HELIX Environmental Planning (HELIX) provided environmental compliance monitoring during construction and during the post-construction phase of the Carlsbad Oaks North
Read more.
Salk Owner’s Association Open Space Restoration & Monitoring
HELIX Environmental Planning (HELIX) biologists and Construction Group staff worked with the Salk Owner’s Association and a group of commercial
Read more.
Inland Feeder Utility Project Habitat Restoration
HELIX Environmental Planning (HELIX) biologists and Construction Group staff conducted upland habitat restoration and enhancement services for approximately 100 acres
Read more.
Orchard at Penryn
HELIX Environmental Planning (HELIX) conducted a biological resource assessment, habitat mapping, and delineated waters of the United States on an
Read more.
City of San Diego Public Utilities Department, As-Needed Environmental Services
HELIX Environmental Planning (HELIX) is currently providing environmental consulting services to the City of San Diego Public Utilities Department (PUD),
Read more.
Greenbriar Habitat Conservation Plan
Located within the Natomas Basin of Sacramento, the Greenbriar Development Project encompasses a 577-acre agricultural site slated for transit-oriented residential
Read more.
Devers to Palo Verde No. 2 Transmission Line
HELIX Environmental Planning (HELIX) provided consulting services support to Aspen Environmental Group for Southern California Edison’s (SCE’s) Devers–Palo Verde No.
Read more.
California Energy Commission As-Needed Biological Services for Solar Projects
HELIX Environmental Planning (HELIX) was under contract to Aspen Environmental Group on an as-needed basis to provide impact analyses for
Read more.
Tule Wind Energy Project
HELIX Environmental Planning (HELIX) provided biological and habitat restoration services for Iberdrola Renewables’ Tule Wind Energy Project located in the
Read more.
Desert Green Solar Project
The 6.3-megawatt Desert Green Solar Farm, located in Borrego Springs, began commercial operations in 2015 . Prior to construction, HELIX
Read more.
Owens Valley Solar Energy Study
Following HELIX Environmental Planning’s (HELIX’s) successful preparation of the Inyo County Renewable Energy General Plan Amendment (REGPA) and Program Environmental
Read more.
Sunrise Powerlink
The Sunrise Powerlink project is an approximately 117-mile-long project that includes a 500 kV transmission line from the Imperial Valley
Read more.
Miramar National Cemetery Vernal Pool Restoration
HELIX Environmental Planning (HELIX) conducted restoration monitoring of a vernal pool mitigation area located on Marine Corps Air Station (MCAS)
Read more.
San Diego County Water Authority Pipeline Relining Projects
HELIX Environmental Planning (HELIX) provided a variety of environmental services for the Water Authority’s pipeline relining projects located in the
Read more.
Pure Water San Diego
HELIX Environmental Planning (HELIX) produced a detailed biological constraints report addressing a 20-year, phased program that involves planning, design, and
Read more.