Biological Resource Studies

Featured Projects . . .
Pure Water San Diego
HELIX Environmental Planning (HELIX) produced a detailed biological constraints report
Read more.
San Diego County Water Authority Pipeline Relining Projects
HELIX Environmental Planning (HELIX) provided a variety of environmental services
Read more.
Miramar National Cemetery Vernal Pool Restoration
HELIX Environmental Planning (HELIX) conducted restoration monitoring of a vernal
Read more.
Sunrise Powerlink
The Sunrise Powerlink project is an approximately 117-mile-long project that
Read more.
Owens Valley Solar Energy Study
Following HELIX Environmental Planning’s (HELIX’s) successful preparation of the Inyo
Read more.
Desert Green Solar Project
The 6.3-megawatt Desert Green Solar Farm, located in Borrego Springs,
Read more.
Tule Wind Energy Project
HELIX Environmental Planning (HELIX) is providing biological services for Iberdrola
Read more.
California Energy Commission As-Needed Biological Services for Solar Projects
HELIX Environmental Planning (HELIX) was under contract to Aspen Environmental
Read more.
Devers to Palo Verde No. 2 Transmission Line
HELIX Environmental Planning (HELIX) provided consulting services support to Aspen
Read more.
Greenbriar Habitat Conservation Plan
Located within the Natomas Basin of Sacramento, the Greenbriar Development
Read more.
City of San Diego Public Utilities Department, As-Needed Environmental Services
HELIX Environmental Planning (HELIX) is currently providing environmental consulting services
Read more.
12 Oaks Winery Resort
HELIX  is preparing technical studies for the 12 Oaks Winery
Read more.
Inland Feeder Utility Project Habitat Restoration
HELIX Environmental Planning (HELIX) biologists and Construction Group staff conducted
Read more.
Salk Owner’s Association Open Space Restoration & Monitoring
HELIX Environmental Planning (HELIX) biologists and Construction Group staff worked
Read more.
Carlsbad Oaks North
HELIX Environmental Planning (HELIX) provided environmental compliance monitoring during construction
Read more.
Palmdale Regional Groundwater Recharge & Recovery
HELIX Environmental Planning prepared an Environmental Impact Report (EIR) and conducted
Read more.