Environmental compliance and natural resource management

Parks, Recreation and Trails

HELIX Environmental Parks, Recreation and Trail Projects
    Boardwalk
  • Santee Town Center Community Park Project IS/MND, BTR, RP and permitting for 61-acre community park (Santee, CA)
  • Santee Town Center Community Park Aquatic/Gymnastic Center Project IS/MND, BTR, HRP and Permitting for 10-acre recreational center development (Santee, CA)
  • Winchester Park Project IS/MND for a controversial community park and reclaimed water pipeline (Riverside County, CA)
  • Mission Beach Boardwalk Widening Project EIR/EA and Section 4(f) Analysis for highly political and sensitive widening of boardwalk/sea wall structure in Mission Beach and Pacific Beach; EIR upheld on CEQA challenge and following appeal (San Diego, CA)
  • Border View YMCA Project MND for recreational facility to include an indoor gymnasium, swimming pool, soccer arena, and parking area on approximately 5 acres within Montgomery Middle School in the Otay Mesa-Nestor community (San Diego, CA)
  • Camp Hope Project IS/EA and MND/FONSI for 17-acre permanent camp development and associated improvements adjacent to Southerland Reservoir (San Diego County, CA)
  • Camino Ruiz Park Project EIR and BTR for a community park located adjacent to Los Peñasquitos Regional Park (San Diego, CA)
  • Rancho Bernardo Park Extension Project BTR for a dog park project (San Diego, CA)
  • Borrego Springs Boys & Girls Club Revision to the Major Use Permit (MUP), site planning, facility design, and existing building expansion plans (San Diego County, CA)
  • Barnett Ranch Project Area-specific Management Directives in Compliance with the MSCP Subarea Plan and BTR for a 720-acre open space park in the San Vicente Corridor (San Diego County, CA)
  • Mast Park Restoration Project HRP, HMP, permitting and restoration services for a 12.7-acre mitigation project along the San Diego River (Santee, CA)
  • San Diego Padres Ballpark and Ancillary Development Subsequent EIR for construction of a new ballpark, park area, sports-oriented retail, and entertainment center for the San Diego Padres, as well as a number of associated development projects including 600,000 s.f. of office, 150,000 s.f. of retail, and 850 hotel rooms within a 26-block area (San Diego, CA)
  • Sea World Master Plan EIR for the Sea World Master Plan Update, to guide future renovation, redevelopment, and expansion of the theme park (San Diego, CA)
  • Memorial Park / W.J. Oaks Boys and Girls Club Project
  • Memorial Park/W.J. Oaks Boys and Girls Club Project Construction documents for an outdoor soccer arena and playground for facility in Logan Heights; plans included demolition, paving and layout designs, irrigation and planting (San Diego, CA)
  • Piñon Hills Park Project Concept plan and construction documents for new basketball and tetherball courts, two playgrounds with poured rubber surfaces and new structures, and a custom entry gate; plans included demolition, grading, construction details, irrigation and planting (San Bernardino County, CA)
  • Collier Park Improvements Project Construction documents for grading, drainage, irrigation, walkways and parking improvements to park in Ramona, including an arena soccer field for use by the Boys and Girls Club of Greater San Diego, conversion of existing tennis courts to basketball court use, a new parking lot and handicap accessible walkways (San Diego County, CA)

| TOP |